01733 895989 Tue-Sat 10:00-5:00, Sun 10:30-3:30, 
Mon Closed
27 St. David's Square, Fengate, Peterborough, UK PE1 5QA
  • £5.95 P&P
  • for all mainland UK deliveries
Product Categories
Brands

Gaugemaster GM2310101 *Mark 3 TS 48101 GWR Castle

Gaugemaster GM2310101 *Mark 3 TS 48101 GWR Castle

FEATURES

  • Metal Wheels
  • NEM coupling as standard
  • Separately applied wire hand rails
  • Detailed Printing and Livery Detail
  • Highly detailed body, underframe, and bogies


PROTOTYPE

The MK3 coaches entered service between 1975 and 1988. These coaches were originally designed as locomotive hauled stock, but were later modified for HST use.

The MK3s share lots of similarities to the MK2s but had a rigid roof and skirted under frame, the length was nearly 10 feet longer at 75 feet over the buffers and the body shell was designed with a stressed steel skin which was lighter and stronger than previous designs.

One of the main advances on the MK3 from the MK2 was the secondary air suspension fitted to the bogie system. This allowed for smoother running and with the primary coil springs and hydraulic dampers the coaches were able to run smoothly at 125mph instead of the limited 100mph from the MK2s.

Most MK3 coaches built are still in service today, including on the Royal Train.

MODEL

The DCC Compatible Plug-In Lighting Bar is an optional extra and can be easily fitted to illuminate the coach from within. The light bar is available in either yellow, for incandescent lighting, or white, for modern lighting.

The light bar can be set for either yellow, for incandescent lighting, or white, for modern lighting.

Name:
Gaugemaster GM2310101 *Mark 3 TS 48101 GWR Castle
Price:
GBP £ 26.05 Saving £2.90 (10.02%) on RRP (£28.95)
Product Code:
GM2310101
Availability:
Out of Stock :: Get Stock Notification
Stock Level:
0